First Climbs 2021
The Build Process

The signage went up on the front of the building…

…along with the rather large ones facing the road.

The front door that you, one day, will walk through!

A blank slate!

The steel racking going up.

Ready for two levels of bouldering.

Plywood going up.

The barrel!

So much wall space!

Upstairs coming together

Campervan parking probably won’t be a feature when the doors open to the public…

So much room for activities!

Upstairs, downstairs.

Plenty of people-parking ready to take the weight of your weary feet

Fast forward through painting and mats going in, there are holds going on the walls!

Slabs, overhangs, caves, The Barrel…

…we’ve made sure there’s something for everyone across two floors!

















Our awesome build team from Strata Climbing getting some pre-lockdown testing done.